Product Details:
|
Material: | Cast Grey Iron | Type: | System / Magnel System / Leonhardt System / Lee-McCall System / Gifford-Udall System |
---|---|---|---|
Purpose: | Prestressed Concrete / Reinforce Concrete / Reinforcing Concrete | Techniques: | Bonded / Unbonded |
Tendons Type: | One Strands/multiple Strands /multistrand/bars | Use Industry: | Bridges |
Intended For: | Developers / Architects / Engineers | Keyword: | Bonded Post Tensioning System |
Highlight: | Wall Bonded Post Tensioning System,Columns Bonded Post Tensioning System,Bonded Residential Post Tension Foundation |
bonded post tensioning system
What is post tensioning in concrete?
Post tensioning is a method of reinforcing (strengthening) concrete or other materials with high-strength steel strands or bars, typically referred to as tendons.
name | bonded post tensioning system |
certified | ISO 9001 |
material | Cast grey iron |
type | system. |
Magnel system. | |
Leonhardt system. | |
Lee-McCall system. | |
Gifford-Udall system. | |
tendons type | one strands |
multiple strands | |
multistrand | |
bars | |
use industry | bridges |
elevated slabs (parking structures and residential or commercial buildings) | |
residential foundations | |
walls, and columns. | |
high rise | |
multi family | |
parking garages | |
hotels | |
offices | |
condominiums | |
intended for | developers |
architects | |
engineers |
fuhua Systems delivers quality, service and value nationwide, specializing in cast-in-place post-tensioned concrete structures.
This includes high rise, multi-family, parking garages, hotels, offices and condominiums. Supported with in-house engineering design support,
fuhua Systems’ encapsulated system is designed for aggressive corrosive environments such as coastal areas and parking garages exposed to de-icing salts. The encapsulated system comprises plastic coated anchorages, 60 mil plastic sheathing and positive locking connection tubes and end caps ensuring complete isolation of the wedge cavity and strand from corrosive elements.
Stressing Equipment is serviced and calibrated prior to delivery to the jobsite. Technical Field Service Representatives provide our Clients with on-site assistance for Tendon Systems installation, stressing and construction sequencing.
outstanding support
do you have questions about post-tensioning systems? get the best answers possible directly from our team.
Contact Person: Mr. Victor
Tel: +86-18614058820
Fax: 86-0317-4710299