|
Product Details:
|
| Name: | Bonded Post Tensioning System | Certified: | Iso 9001 |
|---|---|---|---|
| Material: | Cast Grey Iron | Type: | System / Magnel System / Leonhardt System / Lee-McCall System / Gifford-Udall System |
| Purpose: | Prestressed Concrete / Reinforce Concrete / Reinforcing Concrete | Techniques: | Bonded / Unbonded |
| Tendons Type: | One Strands/multiple Strands /multistrand/bars | Use Industry: | Bridges |
| Intended For: | Developers / Architects / Engineers | Keyword: | Bonded Post Tensioning System |
| Highlight: | Multiple Strands Bonded Post Tensioning System,Anchorage Bonded Post Tensioning System,Bridges Post Tensioning Anchorage Devices |
||
bonded post tensioning system
what is post tensioning in bridge?
bridges. post-tensioning is a method of reinforcing concrete, used extensively in the construction and refurbishment of bridges. high-strength steel tendons are positioned in ducts or sleeves before the concrete is placed.
| name | bonded post tensioning system |
| certified | ISO 9001 |
| material | Cast grey iron |
| type | system. |
| Magnel system. | |
| Leonhardt system. | |
| Lee-McCall system. | |
| Gifford-Udall system. | |
| purpose | prestressed concrete |
| reinforce concrete | |
| reinforcing concrete | |
| techniques | bonded |
| unbonded | |
| tendons type | one strands |
| multiple strands | |
| multistrand | |
| bars | |
| use industry | bridges |
| elevated slabs (parking structures and residential or commercial buildings) | |
| residential foundations | |
| walls, and columns. | |
| high rise | |
| multi family | |
| parking garages | |
| hotels | |
| offices | |
| condominiums | |
| intended for | developers |
| architects | |
| engineers |
outstanding support
do you have questions about post-tensioning systems? get the best answers possible directly from our team.
Contact Person: Mr. Victor
Tel: +86-18614058820
Fax: 86-0317-4710299